Coeur d’Alene Charter Academy

Removal of two existing modular classroom buildings & the construction of 4 new classrooms located in two separate wood framed, wood trussed, slab on grade structures. The project scope also includes site improvements around the 2 new structures, which includes removal of existing asphalt parking lot & the installation of sidewalks & landscaping. The project also requires the removal of an existing wood framed platform structure with stairs & handicap ramps that is to be replaced with a new platform construction. Along with site improvements is addition of canopy structures between the buildings.

Customer: Coeur d’Alene Charter Academy 
Contract Value: $811,667
Year Completed: 2018

Jim Creek Gas Station Renovations

Design-Build services necessary to renovate the existing fueling station, piping, oily water separator, drainage system, covered structure and associated systems.  Demolition and disposal of existing structures, new canopy structure, new concrete and asphalt pavements, new waterline, new emergency shower, & new fuel dispensing systems for both unleaded gasoline & diesel and commissioning of the system.

Customer: NAVFAC Northwest 
Contract Value: $767,087
Year Completed: 2017

Firing Range & Bullet Trap

Unique Design-Build project to design and install a rubber media conveyance system to allow refilling of the bullet trap hoppers, including adding lights & camera system to allow for remote visual inspection and screening of the filling process for active firing range.  Other misc. work included cleaning and abating the range and attic of lead dust contamination, performing duct smoke testing, air sampling, repairing the range floor concrete and polymer flooring, framing, insulating & sheeting with attic walls with GWB and painting, applying epoxy flooring to the attic, repairing range baffles, electrical upgrades & repairs.

Customer: NAVFAC Northwest 
Contract Value: $488,244
Year Completed: 2017

University of Idaho Swim Center

Demo and replace tile and subgrade mortar bed on two pools. Install new waterproofing coating at surge tanks, and pools. Replace some pool equipment with new. Work to include removal and replacement of all tile in the competition pool, removal and replacement of all wall tile in the training pool, and re-grouting of the tile in the bottom of the training pool.

Customer: State of Idaho Division of Public Works
Contract Value: $1,016,379
Year Completed: 2017

USCG Reseal Aviation

Demolish and remove 12,000+SF concrete paving on taxiway.  Place new rebar and pour & finish 400+CY new concrete paving.  Re-stripe pavement markings, fill and seal all new and existing joints (14,000+LF).

Customer: United States Coast Guard 
Contract Value: $825,785
Year Completed: 2017

NSE Main Gate Covered Sentry Station

Design-Build new PEMB canopy structure to cover sentry stations at Main Gate of Naval Station Everett.  Work included demolition, pipe piles, concrete, PEMB, SS metal roofing, steel erection, masonry, painting, asphalt paving, landscaping, electrical, earthwork, storm drain utilities, geotechnical, and A&E.

Customer: NAVFAC Northwest 
Contract Value: $693,939
Year Completed: 2016

Cottonwood BLM Field Offices

The Work includes abatement and demolition of the existing Cottonwood Field Office Complex and construction of a new Field Office Building and Warehouse Building; and associated site development, including utilities, parking, ware yard, fencing and landscaping. Warehouse was CBC PEMB, office building was wood framed.

Customer: Bureau of Land Management Denver
Contract Value: $2,815,202
Year Completed: 2017

Syringa Corridor Hospital Renovations

Renovation of occupied Hospital, Demo, dust containment, infection control all required. Provided customer with upgrades to plumbing, HVAC, Fire suppression/monitoring system construction of new corridor between clinic space and hospital, fabricated and installed fire exit exterior stairs from upper floor, renovation of existing spaces, including reconfiguration of layout, doors and hardware, windows, reception desk, restrooms, roof patch, flooring, drywall, paint, tile, plumbing fixtures, etc. final cleaning. The project was completed in phases with no interruption to the occupants of the facility or public.

Customer: Syringa Hospital 
Contract Value: $950,046
Year Completed: 2016

NNAC New Location

NNAC Headquarters is now in their NEW location at 3901 N Schreiber Way CdA ID 83815.

NNAC Holds Safety Stand Down

NNAC holds a company-wide Safety Stand Down. All project sites stopped work, and conducted a safety meeting in addition to our regular safety meetings so that they could assess all sites with fresh eyes while conducting inspections of how they are adhering to the current site safety plan and NNAC standards.