Coeur d’Alene Charter Academy

Removal of two existing modular classroom buildings & the construction of 4 new classrooms located in two separate wood framed, wood trussed, slab on grade structures. The project scope also includes site improvements around the 2 new structures, which includes removal of existing asphalt parking lot & the installation of sidewalks & landscaping. The project also requires the removal of an existing wood framed platform structure with stairs & handicap ramps that is to be replaced with a new platform construction. Along with site improvements is addition of canopy structures between the buildings.

Customer: Coeur d’Alene Charter Academy 
Contract Value: $811,667
Year Completed: 2018

University of Idaho Swim Center

Demo and replace tile and subgrade mortar bed on two pools. Install new waterproofing coating at surge tanks, and pools. Replace some pool equipment with new. Work to include removal and replacement of all tile in the competition pool, removal and replacement of all wall tile in the training pool, and re-grouting of the tile in the bottom of the training pool.

Customer: State of Idaho Division of Public Works
Contract Value: $1,016,379
Year Completed: 2017

Syringa Corridor Hospital Renovations

Renovation of occupied Hospital, Demo, dust containment, infection control all required. Provided customer with upgrades to plumbing, HVAC, Fire suppression/monitoring system construction of new corridor between clinic space and hospital, fabricated and installed fire exit exterior stairs from upper floor, renovation of existing spaces, including reconfiguration of layout, doors and hardware, windows, reception desk, restrooms, roof patch, flooring, drywall, paint, tile, plumbing fixtures, etc. final cleaning. The project was completed in phases with no interruption to the occupants of the facility or public.

Customer: Syringa Hospital 
Contract Value: $950,046
Year Completed: 2016

CDA Firestation #4

New category 5 Fire Station stick framed, composition shingles, brink wainscot, landscaping, HMA paving & interior finishes. Ground up construction including grading to finish work to build a new fire station.

Customer: City Of Coeur d’Alene
Contract Value: $1,309,592
Year Completed: 2016

Idaho State University Phase II Anatomy Lab

Location: Meridian Idaho
Year Completed: May 2016
Customer: State of Idaho Div of Public Works 
Contract Value: $1,154,166

The Idaho State University Anatomy Lab project consisted of tenant improvement and remodel in an operational cadaver lab in a medical arts college. This project site was treated as hospital conditions for construction and the facility needed to be cleaned and spotless daily. Work could not impact class or class schedules.

The scope of work included new office space, tenant improvement of computer labs, new tenant space for a nationalized standard testing facility and medical labs. Exterior renovations included new entry and courtyard facility for access in to the building. There were a total of five different worksites in the building.