Lapwai Courthouse Renovations

A complete interior renovation of the existing Courthouse. Demolish interior completely, walls, finishes, ceiling, plumbing and light fixtures, ductwork, HVAC units, plumbing lines and electrical wiring and panels. Interior rebuild to consist of new walls, finishes, cabinets, ceilings, CMU holding cells, plumbing, HVAC & electrical.

Customer: Nez Perce Tribe 
Contract Value: $977,638
Year Completed: 2018

Jim Creek Gas Station Renovations

Design-Build services necessary to renovate the existing fueling station, piping, oily water separator, drainage system, covered structure and associated systems.  Demolition and disposal of existing structures, new canopy structure, new concrete and asphalt pavements, new waterline, new emergency shower, & new fuel dispensing systems for both unleaded gasoline & diesel and commissioning of the system.

Customer: NAVFAC Northwest 
Contract Value: $767,087
Year Completed: 2017

Firing Range & Bullet Trap

Unique Design-Build project to design and install a rubber media conveyance system to allow refilling of the bullet trap hoppers, including adding lights & camera system to allow for remote visual inspection and screening of the filling process for active firing range.  Other misc. work included cleaning and abating the range and attic of lead dust contamination, performing duct smoke testing, air sampling, repairing the range floor concrete and polymer flooring, framing, insulating & sheeting with attic walls with GWB and painting, applying epoxy flooring to the attic, repairing range baffles, electrical upgrades & repairs.

Customer: NAVFAC Northwest 
Contract Value: $488,244
Year Completed: 2017

USCG Reseal Aviation

Demolish and remove 12,000+SF concrete paving on taxiway.  Place new rebar and pour & finish 400+CY new concrete paving.  Re-stripe pavement markings, fill and seal all new and existing joints (14,000+LF).

Customer: United States Coast Guard 
Contract Value: $825,785
Year Completed: 2017

NSE Main Gate Covered Sentry Station

Design-Build new PEMB canopy structure to cover sentry stations at Main Gate of Naval Station Everett.  Work included demolition, pipe piles, concrete, PEMB, SS metal roofing, steel erection, masonry, painting, asphalt paving, landscaping, electrical, earthwork, storm drain utilities, geotechnical, and A&E.

Customer: NAVFAC Northwest 
Contract Value: $693,939
Year Completed: 2016

Cottonwood BLM Field Offices

The Work includes abatement and demolition of the existing Cottonwood Field Office Complex and construction of a new Field Office Building and Warehouse Building; and associated site development, including utilities, parking, ware yard, fencing and landscaping. Warehouse was CBC PEMB, office building was wood framed.

Customer: Bureau of Land Management Denver
Contract Value: $2,815,202
Year Completed: 2017

Malmstrom AFB Bldg 1440 ReRoof

Removal of 97,500 sf of existing metal roof system on three-bay hangar building, and installation of new Firestone 90-mil fully adhered EPDM membrane roof system. Work included flashings, cover board, rigid insulation, expansion joints, snow guards, wall infill, metal flashings, copings, trim and heat tape snow-melt system. Working in occupied facility where daily access needed to be maintained in order to allow aircraft removal on a daily basis, and protection of building occupants from overhead hazards.  Temporary entrance protection scaffolding was installed at (21) man doors, and movable rolling scaffolding installed in front of the three hangar bay doors.

Customer: 341st Contracting Squadron Malmstrom AFB 
Contract Value: $1,504,186
Year Completed: 2016