Farallon Island Roof Replacement

Location: Farallon Island, CA
Completion Date: 10/10/2024
Customer: US Fish and Wildlife Service
Contract Amount: $651,129

Description of work: Reroof two houses located 30 miles offshore from the mainland. We removed two layers of shingles, new plywood decking, installed roof ventilation, removed and replaced gutters, removed old attic insulation and replaced it wil blow-in cellulose.

All materials to and from the island were moved by helicopter. We moved approximately 50,000 pounds to the island and brought back 35,000 pounds. All project personnell were transported via helicopter. Moving freight to and from the island required coordination of 11 people on shore for traffic control and public safety.

 

Naval Station Everett Building 2202 – 2nd Floor Addition

Location:  Everett, WA
Completion Date: 01/01/2020 
Customer: NAVFAC
Contract Amount:  $3,714,869

Naval Station Everett Building 2202 2nd Floor Addition project is wrapping up 3-months ahead of schedule and earned NNAC the highest CPARS rating of exceptional across the board for Quality, Schedule, Safety & Management!This was  $3.7M complex Design-Build project to add a 2nd floor for administrative space for PSNS in an occupied facility including all design disciplines; architectural, structural, and modifications/upgrades to existing, mechanical,  electrical, plumbing, communications, and fire alarm systems including building controls networking. 

What the customer says:  

“Quality Control is and has been spot on and timely throughout the construction. Inspections have been conducted on all aspects/trade-work in all phases. Any deficiencies or issues were corrected with no time delay to that work or any part of the schedule. Craftsmanship on every step of this contract have been nothing short of outstanding and NNAC has went above and beyond”. “Contractor has been ahead of schedule on every Major and Minor milestone. Contract is currently 90 days ahead of the Contract Completion Date”.“Experience, Innovation, Safety, Initiative and a Can-Do attitude are all characteristics that NNAC possesses and shows each and every day from the Home Office to the Field.” “NNAC demands excellence from all personnel on the Contract”.“Project Manager and Superintendent on this project went above and beyond on all technical and administrative functions. Met or exceeded all contract requirements, the first time.” “abiding by all Safetystandards and the Strict security requirements of the Area of the construction project. Zero Safety incidents to date and no compromises of Security”.

Urban Air Trampoline Park

Location:  Killeen, Texas
Completion Date: August 2018
Customer: Private Sector
Contract Amount:  $2,417,995
Project: Urban Air Trampoline & Adventure Park

We had the pleasure of building from the ground up, one of the nation’s premier Indoor Trampoline & Adventure Parks, Urban Air. Its an award-winning wall-to-wall trampoline arenas, performance trampolines, dodgeball courts, drop zone, slam dunk tracks, trampoline runway, and an area for ages 7 and under. In addition to the trampoline attractions, this location included Urban Air’s latest adventure attraction, called the Urban Two-Story Warrior Course™, Warrior Battle Beam, TUBES Indoor Playground, Sky Track Indoor Coaster and Indoor Ropes Course.

From the beginning, we had challenges – from the freezing rainy weather impacting the select base mix of the site work, to all the indoor equipment was delivered 3 months before schedule, to changes the owner wanted right before the opening, that had to be approved by the City Engineers before work could be successfully completed. Despite these challenges, with the help of 15 local subcontractors with scopes including Site Work, Masonry, Plumbing, Metal Building Fabrication, Carpentry, HVAC, Electric, Mechanical, Paving, and Painting, we were able to release a completed & equipped building 10days ahead of schedule, ready to entertain the waiting community.

Glover Middle School

Location: Spokane, WA
Completion Date: 2/21/2020
Customer: Spokane Public Schools
Contract Amount: $282,663
Architecture: NAC Architecture

Description of work; Site clearing; rough grading; topsoil and excess soil export; related erosion, sedimentation, and dust control; installation of underground natural gas service.

Coeur d’Alene Charter Academy

Removal of two existing modular classroom buildings & the construction of 4 new classrooms located in two separate wood framed, wood trussed, slab on grade structures. The project scope also includes site improvements around the 2 new structures, which includes removal of existing asphalt parking lot & the installation of sidewalks & landscaping. The project also requires the removal of an existing wood framed platform structure with stairs & handicap ramps that is to be replaced with a new platform construction. Along with site improvements is addition of canopy structures between the buildings.

Customer: Coeur d’Alene Charter Academy 
Contract Value: $811,667
Year Completed: 2018

Idaho State University Phase II Anatomy Lab

Location: Meridian Idaho
Year Completed: May 2016
Customer: State of Idaho Div of Public Works 
Contract Value: $1,154,166

The Idaho State University Anatomy Lab project consisted of tenant improvement and remodel in an operational cadaver lab in a medical arts college. This project site was treated as hospital conditions for construction and the facility needed to be cleaned and spotless daily. Work could not impact class or class schedules.

The scope of work included new office space, tenant improvement of computer labs, new tenant space for a nationalized standard testing facility and medical labs. Exterior renovations included new entry and courtyard facility for access in to the building. There were a total of five different worksites in the building.