NNAC_Construction_Coeur_d_Alene_Boise_Idaho_Texas_Construction_Management_Design_Build_Heavy_Civil_Work_Naval_Station_Everett_Washington3

Naval Station Everett Building 2202 – 2nd Floor Addition

Location:  Everett, WA
Completion Date: 01/01/2020 
Customer: NAVFAC
Contract Amount:  $3,714,869

Naval Station Everett Building 2202 2nd Floor Addition project is wrapping up 3-months ahead of schedule and earned NNAC the highest CPARS rating of exceptional across the board for Quality, Schedule, Safety & Management!This was  $3.7M complex Design-Build project to add a 2nd floor for administrative space for PSNS in an occupied facility including all design disciplines; architectural, structural, and modifications/upgrades to existing, mechanical,  electrical, plumbing, communications, and fire alarm systems including building controls networking. 

What the customer says:  

“Quality Control is and has been spot on and timely throughout the construction. Inspections have been conducted on all aspects/trade-work in all phases. Any deficiencies or issues were corrected with no time delay to that work or any part of the schedule. Craftsmanship on every step of this contract have been nothing short of outstanding and NNAC has went above and beyond”. “Contractor has been ahead of schedule on every Major and Minor milestone. Contract is currently 90 days ahead of the Contract Completion Date”.“Experience, Innovation, Safety, Initiative and a Can-Do attitude are all characteristics that NNAC possesses and shows each and every day from the Home Office to the Field.” “NNAC demands excellence from all personnel on the Contract”.“Project Manager and Superintendent on this project went above and beyond on all technical and administrative functions. Met or exceeded all contract requirements, the first time.” “abiding by all Safetystandards and the Strict security requirements of the Area of the construction project. Zero Safety incidents to date and no compromises of Security”.

Let's Connect