Coeur d’Alene Charter Academy

Removal of two existing modular classroom buildings & the construction of 4 new classrooms located in two separate wood framed, wood trussed, slab on grade structures. The project scope also includes site improvements around the 2 new structures, which includes removal of existing asphalt parking lot & the installation of sidewalks & landscaping. The project also requires the removal of an existing wood framed platform structure with stairs & handicap ramps that is to be replaced with a new platform construction. Along with site improvements is addition of canopy structures between the buildings.

Customer: Coeur d’Alene Charter Academy 
Contract Value: $811,667
Year Completed: 2018

University of Idaho Swim Center

Demo and replace tile and subgrade mortar bed on two pools. Install new waterproofing coating at surge tanks, and pools. Replace some pool equipment with new. Work to include removal and replacement of all tile in the competition pool, removal and replacement of all wall tile in the training pool, and re-grouting of the tile in the bottom of the training pool.

Customer: State of Idaho Division of Public Works
Contract Value: $1,016,379
Year Completed: 2017

CDA Firestation #4

New category 5 Fire Station stick framed, composition shingles, brink wainscot, landscaping, HMA paving & interior finishes. Ground up construction including grading to finish work to build a new fire station.

Customer: City Of Coeur d’Alene
Contract Value: $1,309,592
Year Completed: 2016

Malmstrom AFB Bldg 1440 ReRoof

Removal of 97,500 sf of existing metal roof system on three-bay hangar building, and installation of new Firestone 90-mil fully adhered EPDM membrane roof system. Work included flashings, cover board, rigid insulation, expansion joints, snow guards, wall infill, metal flashings, copings, trim and heat tape snow-melt system. Working in occupied facility where daily access needed to be maintained in order to allow aircraft removal on a daily basis, and protection of building occupants from overhead hazards.  Temporary entrance protection scaffolding was installed at (21) man doors, and movable rolling scaffolding installed in front of the three hangar bay doors.

Customer: 341st Contracting Squadron Malmstrom AFB 
Contract Value: $1,504,186
Year Completed: 2016

Idaho State University Phase II Anatomy Lab

Location: Meridian Idaho
Year Completed: May 2016
Customer: State of Idaho Div of Public Works 
Contract Value: $1,154,166

The Idaho State University Anatomy Lab project consisted of tenant improvement and remodel in an operational cadaver lab in a medical arts college. This project site was treated as hospital conditions for construction and the facility needed to be cleaned and spotless daily. Work could not impact class or class schedules.

The scope of work included new office space, tenant improvement of computer labs, new tenant space for a nationalized standard testing facility and medical labs. Exterior renovations included new entry and courtyard facility for access in to the building. There were a total of five different worksites in the building.

Capitol Annex

Capitol Annex is a phased project that consisted of 4 levels of interior work to be performed including MEP’s and exterior work also. This is the final stage of this building before it gets turned over to the owner. NNAC provided the overall management of subcontractors and vendors / suppliers and is the POC for the owner regarding this project. NNAC managed over 18 subcontractors with scopes including roofing, masonry, electrical, mechanical, plumbing, architectural, and steel erection.

Location: Boise, ID
Customer: Idaho Dept. of Public Works
Completion Date: June, 2015
Contract Amount: $3,606,000

KI17008 Urban Air Killeen

NNAC worked closely with the franchise owners of this project to adapt the design and final product to meet the trampoline park’s specific requirements. Several adaptations were made to the PEMB to ensure the facility could accommodate the trampoline park equipment and rides, while also meeting city building codes and safety requirements. NNAC also performed several scopes of work as construction allowances, allowing the customer to save money and stay under budget.