Boise McClure 4th Floor IWI

Location: Boise, ID
Customer: PSNS
Contract Amount: $3,700,000

This was  $3.7M complex Design-Build project to add a 2nd floor for administrative space for PSNS in an occupied facility including all design disciplines; architectural, structural, and modifications/upgrades to existing, mechanical,  electrical, plumbing, communications, and fire alarm systems including building controls networking.

What the customer says:  

“Quality Control is and has been spot on and timely throughout the construction. Inspections have been conducted on all aspects/trade-work in all phases. Any deficiencies or issues were corrected with no time delay to that work or any part of the schedule. Craftsmanship on every step of this contract have been nothing short of outstanding and NNAC has went above and beyond”.

 “Contractor has been ahead of schedule on every Major and Minor milestone. Contract is currently 90 days ahead of the Contract Completion Date”.

“Experience, Innovation, Safety, Initiative and a Can-Do attitude are all characteristics that NNAC possesses and shows each and every day from the Home Office to the Field.” “NNAC demands excellence from all personnel on the Contract”.

“Project Manager and Superintendent on this project went above and beyond on all technical and administrative functions. Met or exceeded all contract requirements, the first time.” “abiding by all safety standards and the Strict security requirements of the Area of the construction project. Zero Safety incidents to date and no compromises of Security”.

Lapwai Courthouse Renovations

A complete interior renovation of the existing Courthouse. Demolish interior completely, walls, finishes, ceiling, plumbing and light fixtures, ductwork, HVAC units, plumbing lines and electrical wiring and panels. Interior rebuild to consist of new walls, finishes, cabinets, ceilings, CMU holding cells, plumbing, HVAC & electrical.

Customer: Nez Perce Tribe 
Contract Value: $977,638
Year Completed: 2018

Jim Creek Gas Station Renovations

Design-Build services necessary to renovate the existing fueling station, piping, oily water separator, drainage system, covered structure and associated systems.  Demolition and disposal of existing structures, new canopy structure, new concrete and asphalt pavements, new waterline, new emergency shower, & new fuel dispensing systems for both unleaded gasoline & diesel and commissioning of the system.

Customer: NAVFAC Northwest 
Contract Value: $767,087
Year Completed: 2017

Firing Range & Bullet Trap

Unique Design-Build project to design and install a rubber media conveyance system to allow refilling of the bullet trap hoppers, including adding lights & camera system to allow for remote visual inspection and screening of the filling process for active firing range.  Other misc. work included cleaning and abating the range and attic of lead dust contamination, performing duct smoke testing, air sampling, repairing the range floor concrete and polymer flooring, framing, insulating & sheeting with attic walls with GWB and painting, applying epoxy flooring to the attic, repairing range baffles, electrical upgrades & repairs.

Customer: NAVFAC Northwest 
Contract Value: $488,244
Year Completed: 2017

USCG Reseal Aviation

Demolish and remove 12,000+SF concrete paving on taxiway.  Place new rebar and pour & finish 400+CY new concrete paving.  Re-stripe pavement markings, fill and seal all new and existing joints (14,000+LF).

Customer: United States Coast Guard 
Contract Value: $825,785
Year Completed: 2017

NSE Main Gate Covered Sentry Station

Design-Build new PEMB canopy structure to cover sentry stations at Main Gate of Naval Station Everett.  Work included demolition, pipe piles, concrete, PEMB, SS metal roofing, steel erection, masonry, painting, asphalt paving, landscaping, electrical, earthwork, storm drain utilities, geotechnical, and A&E.

Customer: NAVFAC Northwest 
Contract Value: $693,939
Year Completed: 2016